Vestas - Ending this exciting week with a picture of our first V150 installed at the Bäckhammer Project in Sweden where the team is installing a total of 9 x V150 and
![Vestas Wind Systems on X: "Last weekend, #Vestas installed the first Cable-Stayed Tower turbine at the Viinamäki project, the first merchant onshore wind project in Finland 🇫🇮, allowing us to achieve 175-metre Vestas Wind Systems on X: "Last weekend, #Vestas installed the first Cable-Stayed Tower turbine at the Viinamäki project, the first merchant onshore wind project in Finland 🇫🇮, allowing us to achieve 175-metre](https://pbs.twimg.com/media/D-dQXvrX4AA3geV.jpg)
Vestas Wind Systems on X: "Last weekend, #Vestas installed the first Cable-Stayed Tower turbine at the Viinamäki project, the first merchant onshore wind project in Finland 🇫🇮, allowing us to achieve 175-metre
Vestas - This week, the V150-4.2 MW turbine prototype was installed at the Østerild National test centre for large wind turbines in Western Jutland, Denmark. Stretching more than 200 metres into the
![Turbina eólica de eixo horizontal - V150-4.2 MW™ - Vestas - de três pás / on-shore / sobre mastro independente Turbina eólica de eixo horizontal - V150-4.2 MW™ - Vestas - de três pás / on-shore / sobre mastro independente](https://img.archiexpo.com/pt/images_ae/photo-m2/88087-19005259.webp)